Showing posts with label vermont hat. Show all posts
Showing posts with label vermont hat. Show all posts

Monday, February 15, 2010

One project down

And unknown amounts more to go.

I finished the Ravelympics/Vermont/colorwork hat I was working on. See?














































Cool looking top decreases, right? I thought so. Granted, I semi-designed them ... based on my normal decrease pattern and a part of the original chart.

Anyway. It's not perfect, but I'm pretty fond of it. And I finished it early this morning. Took me 3 days and 7 hours. Not too shabby.

I'll do Zane's HellSackboy next, but I'm not casting on for that one just yet, even though I am on a deadline and my new goal is to finish as many projects as possible. Right now, no knitting. I'm just going to go catch up on all the sleep I didn't get last night because I was too busy finishing this hat!

Sunday, February 14, 2010

Looks like a hat ...

Well. So. Remember how I said I'd be lucky to finish my fair isle hat before the end of the Olympics/Ravelympics? Well, I was wrong about that. I'm not quite on the home stretch yet, but I'm close. I'm 10 rows away from starting the decreases. I could very conceivably finish this hat today, only 2 days after starting it and with 15 days to spare in the competition.

I can't believe the knitting is going this quickly. I mean, I've knit hats in a single day before, but they were plain stockinette hats with worsted weight yarn and size 5 circular needles/size 6 dpns for the top. I've barely knit any stranded colorwork before, and what I did knit was with worsted weight or heavier. And it was certainly MUCH slower than my normal knitting pace. We're talking hours to finish a 20 st x 10 row swatch. Plus, smaller needles and yarn require more stitches, and therefore more time, to fill the same amount of space as larger yarn and needles, and I am noticeably slower on dpns than I am with circs. So how in the world am I managing to knit a fully-stranded hat on size 3 dpns in only 2 days?!

This is completely unexpected, and it baffles me. I was betting on 4 rows per day for my average. Um, yeah. Try 34 today. I only have 29 rows left, 19 of which take place after the decreases begin, which means they're all getting shorter and shorter. But even if you ignore that, if I only worked 2 rows per day, I'd STILL finish in time for a Ravelympics medal.

But I'm not going to do that. I'm going to finish this hat as quickly as I can, then I'm moving on to Zane's HellSackboy. I'll include it with my Ravelympics projects too, and I should be able to finish it easily. So I'll also include another project from the top of my queue. I just haven't figured out yet which one I'll start after the plushie. Luke's gloves aren't eligible, but the matching hat is. So is my hat and glove set. I'm just not sure which I want to knit most. I want to get Luke's hat out of the way, but it's another hat knit with fingering weight out of size 3s, and quite frankly, I don't know if I can take it this soon after working the Vermont Hat. I don't know. I'll figure it out later.

In the meantime ... today's progress:





It looks like a hat, but it fits like a glove. Maybe it's because it's 3 a.m., but I find that little pun extremely funny right now.

This hat also happens to be insanely comfortable, and I can't wait to wear it. I need to measure and make sure the length is working out properly before I start knitting tomorrow; I may even be able to shorten the hat a little. It also has a few ladders, but I think I can easily take care of those with blocking.

I think I now have the fair isle bug. You know, to go along with my lace bug and my cable bug?

Hi, my name is Amie, and I'm a knitaholic.

Saturday, February 13, 2010

Olympian challenges

Short blog post tonight, because it's 2 a.m. and I've been knitting almost non-stop since a little past 9 p.m. I so did not realize it had been that long! :) That's good, though, because I have a lot of work to do in a small amount of time.

You see, Jess and I are both participating in the Ravelympics. I'll let her blog about her own project, but I'm competing in both the Hat Halfpipe and the Nordic Colorwork Combined events with the same project: the Vermont Hat. Knitting started tonight at the same time the Olympics opening ceremony began, and the challenge is to complete your project(s) before midnight on the last day of the Olympics. This gives us ... 17 days? I think?

Yes, my only goal is for one hat. Yes, hats are my niche. But this one is slightly different. For one thing, it's fair isle. Much, much slower than my normal hat-making. Also, I'm using fingering weight yarn (Knitpicks Palette) on size 3 needles, which is quite a bit smaller than my normal dk-to-worsted on 5s. It's going to be a real challenge for me to get finished in such a short time period, especially since I'll be at work for the majority of those days and my knitting time will be limited. But I'm excited about the prospect, and hey, maybe the Ravelympics will be just the inspiration I need to push me to finish.

Oh, and by the way, that original hat was worked in worsted weight yarn, and the top is solid color. The second color is only used around the "tube" part of the hat (technical term there). I didn't like that (stupid perfectionism!) so, as usual, I modified it. First I modified the hat to work with fingering weight, then I added extra colorwork designs to the crown of the hat, all the way up to the decreases. The last row that uses the second color is only 2 rows away from finishing the hat, and the next-to-last row would've been a solid-color row anyway. I'm kind of proud of my modifications on this one.

For now, anyway. Ask me again when I'm rushing to complete all that colorwork on the last day of the Ravelympics.

I will, however, explain what I did later if it works out well. I won't provide my complete chart, because that would be copyright infringement, but I can show off what I added and explain my other mods.

This is my first real fair isle project, by the way. I've done some practice stuff, and a little bit of intarsia, but I've never really done any large-scale stranded colorwork. I think I enjoy it. Which is probably a good thing, since I am completely in love with a lot of stranded colorwork patterns. Oh the prospects.

So, now that I've bored you with all those details, wanna see a picture of tonight's progress?



In case you can't tell from that terrible photo, my yarn is green and white, just like the pattern photo. It's Palette colorways Edamame and Cream, if you're interested.

I got through 5 rows of ribbing (on size 1s to help it do what ribbing's supposed to do: pull inward and stay snug around the body) and 5 rows past that, the first of which was just a solid color. I probably won't average 10 rows every day. That would be asking too much. Although, I have to admit, I was knitting 132 sts of 1x1 ribbing on size 1 Boye needles, which is no easy feat ... that didn't exactly go quickly, either.

Still, I like how it's turning out, and I'm 1/12 of the way to the decreases, not counting the ribbing or the solid row immediately following it. If I can work 4 stranded rows per day, I should be ready to start the decreases 11 days from now, leaving me 5 days for the decreases. That is definitely doable, since there are only 19 rows of decreases and the rows are shorter, ending with only 12 stitches after the last row.

I can do this. I can do this! But I might need you all to cheer me on. I respond very well to compliments and encouragement. ;)

More information on both Jess's Ravelympics project and my own is available on our respective Ravelry pages, which have been conveniently linked for you on the sidebar. Because my perfectionism doesn't just apply to hats.